The roof, the roof, the roof is DONE
Nov. 21st, 2010 10:30 pm![[personal profile]](https://www.dreamwidth.org/img/silk/identity/user.png)
I'm exhausted. Yesterday Jeff had tix for the Indiana U-Penn State game played here at FedEx Field, that was the major event of the day. We enjoyed ourselves, Penn State won handily. The thing that got to me was the walking. The exercise was welcome, but couple that with crawling in the attic the day before. This morning, I was a sore, tired old man. I had wanted to finish up the rough framing for the skylights after the game, but my heart wasn't in it.
Today totally kicked my ass though. The crew showed up to do the roof, I installed the skylights and spent most of the day clambering under and on the roof getting things installed. Both the house and the garage have completely new roofs on them, in a single day! Jeff the Chef kept the guys on site by putting out one hell of a spread for lunch, which made for very appreciative workers. The only sidetrack ended up being the dump truck that was used to haul away the old roofing, trash and junk left from the work. The house was done first, then the dump truck was moved down the second driveway to the garage. Well, the weight of the old, heavy roofing from a 2500 sq ft house and a 900 sq ft garage proved a bit too much for the dump truck, which could not make it back up the steep driveway from the garage. I dropped what I was doing to haul the dump truck out with the Silverado after disconnecting the trailer and reconnecting it afterward. The only remaining tasks involving the hired crew is replacement of all the guttering and downspouts. The gutters have long been in need of replacement, and since this guy has a means to make continuous length guttering, I jumped at the chance to have the entire thing done and not have to worry about roofs, leaks and failed guttering for a couple more decades. I completed the sun tunnel as well, and will build the light shafts for the living room skylights after T-Day.
I have finally taken care of this project which started before Mom got sick, and was delayed again and again due to my own health issues. This time was do or die, and I had only a small window of opportunity to complete this before the weather got bad. I might be paying for my effort with some soreness for a couple days, but I think I managed to find the right time to do it all. This is a major accomplishment for me, and the satisfaction I feel for getting it done pales in comparison to the lifting of the burdens, direct and indirect, physical and mental, that have been on my mind for all these years. I can sleep peacefully now, especially if it is raining.
It's time for me to haul my spent body into bed. It's gonna be a busy week.
G'nite!
Today totally kicked my ass though. The crew showed up to do the roof, I installed the skylights and spent most of the day clambering under and on the roof getting things installed. Both the house and the garage have completely new roofs on them, in a single day! Jeff the Chef kept the guys on site by putting out one hell of a spread for lunch, which made for very appreciative workers. The only sidetrack ended up being the dump truck that was used to haul away the old roofing, trash and junk left from the work. The house was done first, then the dump truck was moved down the second driveway to the garage. Well, the weight of the old, heavy roofing from a 2500 sq ft house and a 900 sq ft garage proved a bit too much for the dump truck, which could not make it back up the steep driveway from the garage. I dropped what I was doing to haul the dump truck out with the Silverado after disconnecting the trailer and reconnecting it afterward. The only remaining tasks involving the hired crew is replacement of all the guttering and downspouts. The gutters have long been in need of replacement, and since this guy has a means to make continuous length guttering, I jumped at the chance to have the entire thing done and not have to worry about roofs, leaks and failed guttering for a couple more decades. I completed the sun tunnel as well, and will build the light shafts for the living room skylights after T-Day.
I have finally taken care of this project which started before Mom got sick, and was delayed again and again due to my own health issues. This time was do or die, and I had only a small window of opportunity to complete this before the weather got bad. I might be paying for my effort with some soreness for a couple days, but I think I managed to find the right time to do it all. This is a major accomplishment for me, and the satisfaction I feel for getting it done pales in comparison to the lifting of the burdens, direct and indirect, physical and mental, that have been on my mind for all these years. I can sleep peacefully now, especially if it is raining.
It's time for me to haul my spent body into bed. It's gonna be a busy week.
G'nite!