An important job needs to be done
Feb. 23rd, 2006 09:06 pmSystem Status: Enabled and confidence check good.
Emitters: Ready and intermix ratio at optimum.
Targeting: Target acquired and locked. Beam pattern sharp.
Power levels: Primary: Maximum. Secondary: Maximum. Reserve: Unlimited.
Payload Status: Ready for delivery.
Initiating Beam Generator.
Beam engaged. Inserting Payload.
Payload Type: Dual. Payload contents: Best Wishes and Warm Hugs.
Target:
beg1n/Jeff.
Payload Delivery In Progress. Duration of Delivery: As long as it's needed, plus reserve. Intensity: Maximum. And then some.
All Systems Are Go. Be well, my friend.
Emitters: Ready and intermix ratio at optimum.
Targeting: Target acquired and locked. Beam pattern sharp.
Power levels: Primary: Maximum. Secondary: Maximum. Reserve: Unlimited.
Payload Status: Ready for delivery.
Initiating Beam Generator.
Beam engaged. Inserting Payload.
Payload Type: Dual. Payload contents: Best Wishes and Warm Hugs.
Target:
![[livejournal.com profile]](https://www.dreamwidth.org/img/external/lj-userinfo.gif)
Payload Delivery In Progress. Duration of Delivery: As long as it's needed, plus reserve. Intensity: Maximum. And then some.
All Systems Are Go. Be well, my friend.